All bid workspace articles

Uploading your ITT, what happens next

From upload to ready-to-draft: every step the system performs, and what to do if anything is missed.

5 min read Updated 22 May 2026

When you upload an ITT (Invitation to Tender), the workspace runs a sequence of processing steps before you start drafting. The whole pipeline typically completes in 90 seconds to 3 minutes depending on document length.

The processing pipeline

  1. 1
    Upload
    PDF, Word, or ZIP (for multi-document ITTs). Files up to 200MB.
  2. 2
    Reading
    Document is parsed, text extracted from PDFs (including scanned PDFs via OCR), Word structure preserved.
  3. 3
    Extracting
    Tender metadata identified, buyer, reference number, deadline, value, submission method.
  4. 4
    Detecting
    Contract form detected (NEC3/4, FIDIC, JCT, etc.) and the relevant compliance report initialised.
  5. 5
    Compliance scan
    Mandatory criteria, Z-clauses, X-clauses, key obligations, risk flags.
  6. 6
    Matching
    Questions extracted and matched against your vault for draft pre-population.
  7. 7
    Ready
    Workspace opens with questions in left navigator, draft editor in centre, AI assistant on right.

If questions are missed

Sometimes the parser misses questions, particularly in unusually formatted ITTs. Open the Bid Structure Navigator on the left, click Add question, paste the question text and word limit, and the workspace adds it to your response and pre-populates a draft from your vault.

Was this article helpful?

If you still need help, our support team replies within one business day.

Contact support